Times Microwave
To Request Literature click here 800-TMS-COAX (867-2629)
To Visit Our Site in China click here Check out TMS on YouTube YouTube

Coaxial Cable - Attenuation & Power Handling Calculator

Coaxial Cable Data
Product:
Frequency (MHz):
Run Length (Feet):
 

Product Performance Parameters

Nominal Attenuation: 8 db/100ft 26.1 db/100mtr
Average Power: 0.1 KW
Cable Vg: 66 %
Nominal Td: 1.54 nSec/ft 5.05 nSec/mtr
Capacitance: 20.3 pF/ft 66.5 pF/mtr
Typical Connector Loss: 0.05 dB/pair

Cable Assembly Performance

Maximum Cable Assembly Loss: 8 dB
Cable Run Efficiency: 16 %
Cable Run Time Delay: 153.94 nSec

Click here for more information on this product

Values are nominal 25°C performance calculations. Actual measured values may vary from the calculated values based on manufacturing tolerances, cable assembly length, connector performance, actual operating frequency, and measurement accuracy.

The calculator will only return data for Frequencies below the Cutoff Frequency, or fco of the cable. A caution is displayed when data is being presented above the highest frequency verified during production testing of the cable.

The Power Handling calculation is based on operation under controlled conditions: 25°C, sea level, still air (natural convection) environment. Power handling may be limited by connector choice. If your application will operate at high power levels, contact a Times Application Engineering Representative for additional information.

CHECK STOCK OR BUY ONLINE NOW

Click to begin:

StockCheck

Upcoming Events

  • Wispalooza
    Oct 9, 2018 - Oct 13, 2018
    Las Vegas, NV
  • SPCD 2018
    Oct 9, 2018 - Oct 12, 2018
    Noordwijk, Netherlands
  • BICSI Regional Conference
    Oct 12, 2018 - Oct 12, 2018
    Shawnee, PA
  • EdiCon
    Oct 17, 2018 - Oct 19, 2018
    Santa Clara, CA
  • IME/China
    Oct 24, 2018 - Oct 26, 2018
    Shanghai, China
  • Aberdeen Proving Ground Fall Tech Expo
    Oct 24, 2018 - Oct 24, 2018
    Aberdeen, MD
  • BICSI Regional Conference
    Oct 26, 2018 - Oct 26, 2018
    Danbury, CT
  • Trimble Dimensions
    Nov 5, 2018 - Nov 7, 2018
    Las Vegas, NV
  • ITC/USA
    Nov 5, 2018 - Nov 8, 2018
    Glendale, AZ